Apex, Tribeca
Workplace
A contemporary canal-side laboratory building at the centre of London’s new science district.
Project Details
-
London
Location
-
Reef + Partners
Client
-
10,500 sq m
Area
-
£28m
Value
-
2025
Completion
The Apex is the first phase of Tribeca, a 1.1 million square foot mixed-use development for Reef Group that brings science, housing and public space to the Regent’s Canal. Designed as a flexible hub for emerging biotech companies, the building provides six floors of laboratories, write-up areas and social space managed by The Crick Institute and the London Bioscience Innovation Centre.
Conceived as a modern warehouse, the deep brick façade curves along the canal and is punctuated by large windows with inset terraces. Above, two upper floors are set back behind vertical fins, creating a generous planted roof terrace with views over King’s Cross.
Internally, a double-height reception connects street and canal levels, with a café overlooking the water. The building’s basement walls use unfired earth blocks made from site-excavated soil — a collaboration with brickmaker HG Matthews that achieves a 90% reduction in embodied carbon compared with standard concrete blocks.
The Apex demonstrates how design innovation and scientific research can coexist within a robust urban architecture rooted in place and material honesty.
“What Bennetts Associates pioneered at Tribeca, with regards to the Earth Blocks is revolutionary and amazing. We were very impressed by their innovative and creative thinking. They added huge value to the project.”
Peter Langly-Smith
Development Director, Reef + Partners
Credits
-
Reef Group
Client
-
Gardiner & Theobald
Project Manager
-
GD Partnership
Structural Engineer
-
K J Tait
Services Engineer
-
Gardiner & Theobald
Cost Consultant
-
Sandy Brown
Acoustic Consultant
-
Fabrik / Camlins
Landscape Consulstant
-
Volkerfitzpatrick
Contractor